Submission on construction works of Hong Kong Boundary Crossing Facilities Island of Hong Kong-Zhuhai-Macao Bridge from Save Lantau Alliance dated 11 November 2015 (Chinese version only)
Administration's paper on 13GB - Liantang/Heung Yuen Wai Boundary Control Point and associated works - construction of boundary control point buildings and associated facilities (Powerpoint presentation materials) (Chinese version only)
Administration's paper on 666CL - Formation, roads and drains in Area 54, Tuen Mun - phase 1; 681CL - Formation, roads and drains in Area 54, Tuen Mun - phase 2; and 99WC - Water supply to Northwestern Tuen Mun (Powerpoint presentation materials) (Chinese version only)
Administration's paper on PWP Item No. 5019GB - Liantang/Heung Yuen Wai Boundary Control Point and associated works - site formation and infrastructure works (Powerpoint presentation materials) (Chinese version only)
Administration's paper on 770CL - Planning, engineering and architectural study for topside development at Hong Kong boundary crossing facilities island of Hong Kong-Zhuhai-Macao Bridge (Powerpoint presentation materials) (Chinese version only)
Administration's paper on 19GB - Liantang/Heung Yuen Wai Boundary Control Point and associated works - site formation and infrastructure works (Powerpoint presentation materials) (Chinese version only)
Administration's paper on PWP Item No. 111KA - Government, institution or community facilities in the Kwun Tong Town Centre Redevelopment - additional medical and health facilities (Powerpoint presentation materials) (Chinese version only)
Administration's paper on PWP Item No. 163TB (part) - Kwun Tong Town Centre redevelopment - provision of grade-separated pedestrian linkages (Yuet Wah Street Pedestrian Linkage) (Powerpoint presentation materials) (Chinese version only)
Administration's paper on PWP Item No. 731CL - Infrastructure works for housing sites adjacent to Lung Ping Road at Tai Wo Ping, Shek Kip Mei (Powerpoint presentation materials) (Chinese version only)