Letter dated 30 September 2015 from the Chairman of the Tsuen Wan District Council regarding the indiscriminate placement of cargo compartments on roadsides (Chinese version only) (Circulated to members only)
Letter dated 5 February 2016 from Hon Steven HO Chun-yin on the environmental impacts on Hong Kong waters arising from alleged disposal of harmful chemicals into Dasha River by Mainland authority (Chinese version only)
Letter dated January 2015 on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Dr Hon Kenneth CHAN Ka-lok (Chinese version only)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from a deputation (民航東涌地區幹事會) dated 6 January 2015 (Chinese version only)
6 January 2015
CB(1)396/14-15(08)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from an individual (王偉英先生) (Chinese version only)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Chairman of a deputation (香港工商網會青年網絡) (Chinese version only)
6 January 2015
CB(1)396/14-15(06)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Chairman, Federation of Hong Kong Industries Group 11 dated 22 December 2014 (Chinese version only)
6 January 2015
CB(1)378/14-15(32)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Chairman, Federation of Hong Kong Industries Group 21 dated 22 December 2014 (Chinese version only)
6 January 2015
CB(1)378/14-15(35)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Chairman, Federation of Hong Kong Industries Group 23 dated 22 December 2014 (Chinese version only)
6 January 2015
CB(1)378/14-15(33)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Chairman, Federation of Hong Kong Industries Group 4 Electrical & Optical Projects dated 22 December 2014 (Chinese version only)
6 January 2015
CB(1)396/14-15(02)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from China Aircraft Services Limited (Chinese version only)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Federation of Hong Kong Industries dated 19 December 2014 (Chinese version only)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from HK Wildlift.net (Chinese version only)
6 January 2015
CB(1)420/14-15(08)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Hong Kong Air Cargo Terminals Employees Union dated 6 January 2015 (Chinese version only)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Hong Kong Airport Ramp Services Employees Union dated 6 January 2015 (Chinese version only)
6 January 2015
CB(1)378/14-15(04)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Hong Kong Association of China Travel Organisers Limited dated 18 December 2014 (Chinese version only)
6 January 2015
CB(1)396/14-15(01)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Hong Kong Economic & Trade Association (Chinese version only)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Hong Kong Professionals And Senior Executives Association dated December 2014 (Chinese version only)
6 January 2015
CB(1)401/14-15(02)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Hong Kong Taxi Owners' Association Limited dated 5 January 2015 (Chinese version only)
6 January 2015
CB(1)378/14-15(09)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Hong Kong Young Industrialists Council dated 19 December 2014 (Chinese version only)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Miss TSE Kwai-ying (Chinese version only)
6 January 2015
CB(1)420/14-15(28)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Miss TSE Shui-lin (Chinese version only)
6 January 2015
CB(1)420/14-15(27)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Miss YAU Pui-man (Chinese version only)
6 January 2015
CB(1)378/14-15(03)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Momentum 107 (Chinese version only)
6 January 2015
CB(1)378/14-15(06)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr AU YEUNG Kwok-wah dated 19 December 2014 (Chinese version only)
6 January 2015
CB(1)420/14-15(13)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr CHAN Wan-sum dated 6 January 2015 (Chinese version only)
6 January 2015
CB(1)420/14-15(18)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr CHENG Chu-hung (Chinese version only)
6 January 2015
CB(1)420/14-15(14)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr CHEUNG Kwong-yam dated 6 January 2015 (Chinese version only)
6 January 2015
CB(1)420/14-15(25)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr CHOW Yiu-jo (Chinese version only)
6 January 2015
CB(1)378/14-15(05)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr HO Pun-hon dated 18 December 2014 (Chinese version only)
6 January 2015
CB(1)420/14-15(12)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr KUNG Hok-sing dated 5 January 2015 (Chinese version only)
6 January 2015
CB(1)378/14-15(31)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr LAM Chiu-ying (Chinese version only)
6 January 2015
CB(1)420/14-15(10)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr LEE Chi-fung dated 5 January 2015 (Chinese Version only)
6 January 2015
CB(1)420/14-15(15)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr LEE Tai-pang dated 5 January 2015 (Chinese version only)
6 January 2015
CB(1)378/14-15(22)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr MAK Wing-wah dated 18 December 2014 (Chinese version only)
6 January 2015
CB(1)420/14-15(11)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr MAN Wai-cheong dated 6 January 2015 (Chinese version only)
6 January 2015
CB(1)378/14-15(15)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr Manson HUNG dated 15 December 2014 (Chinese version only)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr TSE King-tin (Chinese version only)
6 January 2015
CB(1)420/14-15(24)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr TSE Kwok-hong (Chinese version only)
6 January 2015
CB(1)378/14-15(16)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr WONG Kam-chiu (Chinese version only)
6 January 2015
CB(1)378/14-15(26)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Mr WONG Wai-kit (Chinese version only)
6 January 2015
CB(1)420/14-15(19)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Ms CHUI Shing-fan (Chinese version only)
6 January 2015
CB(1)420/14-15(17)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Ms LEE Sau-lan dated 5 January 2015 (Chinese version only)
6 January 2015
CB(1)420/14-15(16)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Ms LI Sau-mui dated 5 January 2015 (Chinese version only)
6 January 2015
CB(1)401/14-15(01)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Ms SO Lai-chun (Chinese version only)
6 January 2015
CB(1)420/14-15(26)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Ms TSE Kwai-ying (Chinese version only)
6 January 2015
CB(1)420/14-15(23)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Ms TSE Lai-ngo (Chinese version only)
6 January 2015
CB(1)420/14-15(04)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from N. T. Taxi Operation Union dated 3 January 2015 (Chinese version only)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Pricewaterhouse Coopers dated 19 December 2014 (Chinese version only)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from San Tau Village (Chinese version only)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Tai Wo Motors Limited dated 29 December 2014 (Chinese version only)
6 January 2015
CB(1)378/14-15(34)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from The Chinese Manufacturers' Association of Hong Kong dated 22 December 2014 (Chinese version only)
6 January 2015
CB(1)378/14-15(24)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from the Founding President of the Hong Kong Environmental Industry Association cum Chairman of Group 26 (Environmental Industry) of the Federation of Hong Kong Industries dated 22 December 2014 (Chinese version only)
6 January 2015
CB(1)378/14-15(29)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from The Hong Kong Shippers' Council dated 19 December 2014 (Chinese version only)
6 January 2015
CB(1)420/14-15(07)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from The Staffs & Workers Union of Hong Kong Civil Airlines dated 6 January 2015 (Chinese version only)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Tsuen Wan Rural Committee dated 15 December 2014 (Chinese version only)
6 January 2015
CB(1)378/14-15(19)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from Tuen Mun Respect for the Aged Association dated 8 December 2014 (Chinese version only)
6 January 2015
CB(1)378/14-15(02)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from United Friendship Taxi Owners and Drivers Association Limited (Chinese version only)
Submission on Expansion of Hong Kong International Airport into a Three-Runway System and its related impacts on the environment from WWF Hong Kong (Chinese version only)
Joint letter from Dr Hon Kenneth CHAN and Hon Dennis KWOK on "Appointment of a joint subcommittee to monitor the implementation of the Three-Runway System at the Hong Kong International Airport" (Chinese version only)
Submission from Green Sense on "Appointment of a joint subcommittee to monitor the implementation of the Three-Runway System at the Hong Kong International Airport" (Chinese version only)
27 April 2015
CB(4)874/14-15(01)
Submission form Park Island Owners' Committee on "Appointment of a joint subcommittee to monitor the implementation of the Three-Runway System at the Hong Kong International Airport" (Chinese version only)
Administration's paper on Control on marine pollution from oil spillage, marine littering and floating refuse (power-point presentation materials) (Chinese version only)
Joint submission on "Receiving public views on the Document for Engaging Stakeholders and the Public issued by the Task Force on External Lighting" from Entertainment Business Rights Concern Group, The Federation of Hong Kong & Kowloon Ballroom and Night Club Merchants and deputation(卡拉OK酒吧業權益促進組) dated 25 October 2013 (Chinese version only)
Submission on "Receiving public views on the Document for Engaging Stakeholders and the Public issued by the Task Force on External Lighting" from a member of the public dated 14 October 2013 (Chinese version only)
28 October 2013
CB(1)177/13-14(03)
Submission on "Receiving public views on the Document for Engaging Stakeholders and the Public issued by the Task Force on External Lighting" from Democratic Alliance for the Betterment and Progress of Hong Kong (Chinese version only)
28 October 2013
CB(1)151/13-14(01)
Submission on "Receiving public views on the Document for Engaging Stakeholders and the Public issued by the Task Force on External Lighting" from Friends of the Earth (HK) dated 21 October 2013 (Chinese version only)
28 October 2013
CB(1)177/13-14(02)
Submission on "Receiving public views on the Document for Engaging Stakeholders and the Public issued by the Task Force on External Lighting" from Green Sense dated 22 October 2013 (Chinese version only)
28 October 2013
CB(1)165/13-14(03)
Submission on "Receiving public views on the Document for Engaging Stakeholders and the Public issued by the Task Force on External Lighting" from Greeners Action dated 24 October 2013 (Chinese version only)
28 October 2013
CB(1)165/13-14(01)
Submission on "Receiving public views on the Document for Engaging Stakeholders and the Public issued by the Task Force on External Lighting" from Hong Kong Catering Industry Association dated 25 October 2013 (Chinese version only)
Submission on "Receiving public views on the Document for Engaging Stakeholders and the Public issued by the Task Force on External Lighting" from Hong Kong Professionals And Senior Executives Association dated October 2013 (Chinese version only)
28 October 2013
CB(1)151/13-14(02)
Submission on "Receiving public views on the Document for Engaging Stakeholders and the Public issued by the Task Force on External Lighting" from Institution of Dining Art dated 17 October 2013 (Chinese version only)
28 October 2013
CB(1)151/13-14(04)
Submission on "Receiving public views on the Document for Engaging Stakeholders and the Public issued by the Task Force on External Lighting" from Mr CHEUNG Kwok-keung, Sai Kung District Council member (Chinese version only)
Administration's paper on Collection of charges for District Cooling System at the Kai Tak Development (power-point presentation materials) (Chinese version only)
Dr Hon Kenneth CHAN Ka-lok's letter concerning the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report dated 25 September 2014 to the Chairman of Panel on Economic Development and Panel on Environmental Affairs (Chinese version only)
Letter dated 20 June 2014 from Hon Albert CHAN Wai-yip requesting discussion on the Environmental Impact Assessment Report on the Three-Runway System Project at the Hong Kong International Airport (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from a deputation (珠江客運有限公司) (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Business and Professionals Alliance for Hong Kong (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Chairman and Vice Chairman of 18 District Councils in Hong Kong (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Federation of Hong Kong Industries (Chinese version only)
30 September 2014
CB(1)1798/13-14(11)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Federation of Hong Kong Industries Group 18 (Chinese version only)
30 September 2014
CB(1)1995/13-14(23)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from fifteen members of the public (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Construction Industry Employees General Union (Chinese version only)
30 September 2014
CB(1)1995/13-14(11)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Economic and Trade Association (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Ideas Centre (Chinese version only)
30 September 2014
CB(1)1995/13-14(20)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Ideas Centre (Chinese version only)
30 September 2014
CB(1)1995/13-14(02)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Professionals and Senior Executives Association (Chinese version only)
30 September 2014
CB(4)1073/13-14(03)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Project Management Exchange Centre (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Momentum 107 (Chinese version only)
30 September 2014
CB(1)1798/13-14(46)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr AU YEUNG Kwok-wah (Chinese version only)
30 September 2014
CB(1)1995/13-14(18)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr Chapman CHEN (Chinese version only)
30 September 2014
CB(1)1995/13-14(31)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr Francis HO Shiu-hay (Chinese version only)
30 September 2014
CB(1)1995/13-14(07)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr Jacky LIM (Chinese version only)
30 September 2014
CB(1)1798/13-14(20)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr KOO Tak-tsai (Chinese version only)
30 September 2014
CB(1)1995/13-14(35)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr LAM Chiu-ying (Chinese version only)
30 September 2014
CB(1)1798/13-14(43)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr MAK Wing-wah (Chinese version only)
30 September 2014
CB(1)1798/13-14(30)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr Samuel TSE (Chinese version only)
30 September 2014
CB(1)1798/13-14(16)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr Simon LEE Siu-po (Chinese version only)
30 September 2014
CB(1)1995/13-14(28)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr Victor LEUNG (Chinese version only)
30 September 2014
CB(1)1995/13-14(32)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr WAN Yuk-shu (Chinese version only)
30 September 2014
CB(1)1798/13-14(44)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr WONG Wai-ying (Chinese version only)
30 September 2014
CB(1)1995/13-14(30)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr YIP Kam-hung (Chinese version only)
30 September 2014
CB(1)1798/13-14(07)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Ms CHAU Chuen-heung, Islands District Council member (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Park Island Owners' Committee (Chinese version only)
30 September 2014
CB(1)1798/13-14(10)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Pollution and Protection Services Limited (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from SD Advocates (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from the Chinese General Chamber of Commerce (Chinese version only)
30 September 2014
CB(1)1798/13-14(38)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from The Chinese Manufacturers' Association of Hong Kong (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Tsuen Wan Community Limited (Chinese version only)
30 September 2014
CB(1)1798/13-14(49)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Tuen Mun Respect for the Aged Association (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Airport Air Freight Employees' Association (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Cathay Pacific Airways Local Staff Union (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Cathay Pacific Local Management Staff Consultative Committee (Chinese version only)
7 October 2014
CB(4)26/14-15(04)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from China Aviation Oil (Hong Kong) Company Limited (Chinese version only)
7 October 2014
CB(1)1995/13-14(09)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Civic Party (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Friends of the Earth (HK) (Chinese version only)
7 October 2014
CB(4)163/14-15(05)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Green Sense (Chinese version only)
7 October 2014
CB(1)1995/13-14(15)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Greeners Action (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Association of China Travel Organisers Ltd. (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Fishermen Consortium (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Inbound Tour Operators Association (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Jewellers' and Goldsmiths' Association Ltd. (Chinese version only)
7 October 2014
CB(4)163/14-15(02)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Tourism Board (Chinese version only)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr Justine TSANG Wen-tien (Chinese version only)
7 October 2014
CB(1)1995/13-14(04)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr William CHAN Kit (Chinese version only)
7 October 2014
CB(4)163/14-15(04)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Save Lantau Alliance (Chinese version only)
7 October 2014
CB(1)1798/13-14(47)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from The Hong Kong Chinese Importers' & Exporters' Association (Chinese version only)
7 October 2014
CB(1)1798/13-14(19)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from The Hong Kong Shippers' Council (Chinese version only)
7 October 2014
CB(4)26/14-15(05)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from the Lion Rock Institute (Chinese version only)
7 October 2014
CB(4)1090/13-14(01)
Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from United Friendship Taxi Owners and Drivers Association Ltd. (Chinese version only)
Submission on "Restriction of sale of energy-inefficient incandescent light bulbs - Outcome of public consultation and way forward" from Friends of the Earth (HK) (Chinese version only)