Airport and aviation services

Three-Runway System Project


Year 2015 - 2016



Year 2014 - 2015



LC Paper No.PaperMeeting date
CB(4)650/14-15(05) Administration's paper on updates on the development of the Three-Runway System at Hong Kong International Airport 23 March 2015
CB(4)863/14-15(01) Administration's written response on "Updates on the development of the Three-Runway System at Hong Kong International Airport" (Follow-up paper) 23 March 2015
IN06/14-15 Information note on "Development of the Hong Kong International Airport" prepared by the Research Office of the Legislative Council Secretariat 23 March 2015
THB(T)CR2/582/08 Legislative Council Brief on Hong Kong International Airport Three-Runway System 23 March 2015
CB(4)934/14-15(02) Letter dated 24 April 2015 from the Administration in response to Hon Albert CHAN Wai-yip and Hon CHAN Chi-chuen's letter dated 20 March 2015 (Follow-up paper) (Chinese version only) 23 March 2015
CB(4)934/14-15(01) Letter from Hon Albert CHAN Wai-yip and Hon CHAN Chi-chuen on "Updates on the development of the Three-Runway System at Hong Kong International Airport" to the Administration dated 20 March 2015 (Follow-up paper) (Chinese version only) 23 March 2015
CB(4)721/14-15(01) Motion passed under the agenda item of "Updates on the development of the Three-Runway System at Hong Kong International Airport" at the meeting on 23 March 2015 23 March 2015
CB(4)650/14-15(06) Paper on the development of the Three-Runway System at the Hong Kong International Airport prepared by the Legislative Council Secretariat (background brief) 23 March 2015
CB(4)694/14-15 Paper on updates on the development of the Three-Runway System at Hong Kong International Airport provided by the Airport Authority Hong Kong (power-point presentation material) (Chinese version only) 23 March 2015
CB(4)692/14-15(01) Speaking notes of the Secretary for Transport and Housing Bureau on updates on the development of the Three-Runway System at Hong Kong International Airport(follow-up paper) (Chinese version only) 23 March 2015
CB(4)864/14-15(01) Joint letter from Dr Hon Kenneth CHAN and Hon Dennis KWOK on "Appointment of a joint subcommittee to monitor the implementation of the Three-Runway System at the Hong Kong International Airport" (Chinese version only) 27 April 2015
CB(4)824/14-15(01) Proposal for appointment of a joint subcommittee to monitor the implementation of the Three-Runway System at the Hong Kong International Airport prepared by the Legislative Council Secretariat 27 April 2015
CB(4)855/14-15(01) Submission from Green Sense on "Appointment of a joint subcommittee to monitor the implementation of the Three-Runway System at the Hong Kong International Airport" (Chinese version only) 27 April 2015
CB(4)874/14-15(01) Submission form Park Island Owners' Committee on "Appointment of a joint subcommittee to monitor the implementation of the Three-Runway System at the Hong Kong International Airport" (Chinese version only) 27 April 2015


Year 2013 - 2014



LC Paper No.PaperMeeting date
CB(1)1626/13-14(03) Administration's paper on the updates on the Third Runway Project in the Hong Kong International Airport 23 June 2014
30 September 2014
7 October 2014
CB(1)1626/13-14(04) Paper on the development of a third runway at the Hong Kong International Airport prepared by the Legislative Council Secretariat (background brief) 23 June 2014
30 September 2014
7 October 2014
CB(1)1663/13-14(01) Paper on updates on the Third Runway Project in the Hong Kong International Airport provided by the Airport Authority Hong Kong (power-point presentation material) 23 June 2014
CB(4)259/14-15(02) Administration and Airport Authority Hong Kong 's paper on follow-up to issues related to the Three-Runway System project for the Hong Kong International Airport and the relevant Environmental Impact Assessment report (Follow-up paper) 30 September 2014
7 October 2014
CB(4)1090/13-14(02) Dr Hon Kenneth CHAN Ka-lok's letter concerning the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report dated 25 September 2014 to the Chairman of Panel on Economic Development and Panel on Environmental Affairs (Chinese version only) 30 September 2014
7 October 2014
CB(4)1101/13-14(01)
• Advisory Council on the Environment's written response to Dr Hon Kenneth CHAN Ka-lok's letter concerning the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report dated 25 September 2014 to the Chairman of Panel on Economic Development and Panel on Environmental Affairs as set out in LC Paper No. CB(4)1090/13-14(02)
30 September 2014
7 October 2014
  Environmental Impact Assessment Report 30 September 2014
7 October 2014
CB(4)1073/13-14(01) Extract of draft minutes of meeting of the Panel on Economic Development held on 23 June 2014 (English version only) 30 September 2014
7 October 2014
CB(1)1693/13-14(01) Letter dated 20 June 2014 from Hon Albert CHAN Wai-yip requesting discussion on the Environmental Impact Assessment Report on the Three-Runway System Project at the Hong Kong International Airport (Chinese version only) 30 September 2014
7 October 2014
CB(4)259/14-15(01) List of follow-up actions arising from the discussion on issues related to the Three-Runway System project for the Hong Kong International Airport and the relevant Environmental Impact Assessment report 30 September 2014
7 October 2014
CB(1)1798/13-14(29) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from a deputation (珠江客運有限公司) (Chinese version only) 30 September 2014
CB(1)1995/13-14(22) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from a member of the public 30 September 2014
CB(1)1995/13-14(33) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Airport Development Concern Network 30 September 2014
CB(1)1798/13-14(17) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Asian Institute of Supply Chains and Logistics, CUHK (English version only) 30 September 2014
CB(1)1995/13-14(34) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Business and Professionals Alliance for Hong Kong (Chinese version only) 30 September 2014
CB(1)1798/13-14(40) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Carrier Liaison Group (English version only) 30 September 2014
CB(1)1798/13-14(32) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Cathay Pacific Services Limited (English version only) 30 September 2014
CB(1)1995/13-14(17) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Chairman and Vice Chairman of 18 District Councils in Hong Kong (Chinese version only) 30 September 2014
CB(1)1798/13-14(28) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from China Aircraft Services Limited (English version only) 30 September 2014
CB(4)1073/13-14(08) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Civic Exchange (English version only) 30 September 2014
CB(1)1798/13-14(41) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Construction Industry Council (English version only) 30 September 2014
CB(1)1798/13-14(35) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from DHL Aviation (Hong Kong) Limited (English version only) 30 September 2014
CB(1)1798/13-14(37) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from ECO Aviation Fuel Services Limited 30 September 2014
CB(1)1798/13-14(45) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Federation of Hong Kong Industries (Chinese version only) 30 September 2014
CB(1)1798/13-14(11) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Federation of Hong Kong Industries Group 18 (Chinese version only) 30 September 2014
CB(1)1995/13-14(23) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from fifteen members of the public (Chinese version only) 30 September 2014
CB(1)1798/13-14(36) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Aircraft Engineering Company Limited (English version only) 30 September 2014
CB(1)1995/13-14(06) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Airline Pilots Association (English version only) 30 September 2014
CB(1)1995/13-14(37) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Airlines 30 September 2014
CB(1)1798/13-14(26) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Association of Freight Forwarding and Logistics Ltd. (English version only) 30 September 2014
CB(1)1995/13-14(08) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Construction Industry Employees General Union (Chinese version only) 30 September 2014
CB(1)1995/13-14(11) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Economic and Trade Association (Chinese version only) 30 September 2014
CB(1)1995/13-14(29) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Green Strategy Alliance (English version only) 30 September 2014
CB(1)1798/13-14(42) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Ideas Centre (Chinese version only) 30 September 2014
CB(1)1995/13-14(20) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Ideas Centre (Chinese version only) 30 September 2014
CB(1)1995/13-14(02) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Professionals and Senior Executives Association (Chinese version only) 30 September 2014
CB(4)1073/13-14(03) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Project Management Exchange Centre (Chinese version only) 30 September 2014
CB(1)1995/13-14(27) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Retail Management Association (English version only) 30 September 2014
CB(1)1798/13-14(24) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from LSG Lufthansa Service Asia Ltd. (English version only) 30 September 2014
CB(1)1798/13-14(03) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Momentum 107 (Chinese version only) 30 September 2014
CB(1)1798/13-14(46) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr AU YEUNG Kwok-wah (Chinese version only) 30 September 2014
CB(1)1995/13-14(18) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr Chapman CHEN (Chinese version only) 30 September 2014
CB(1)1995/13-14(31) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr Francis HO Shiu-hay (Chinese version only) 30 September 2014
CB(1)1995/13-14(07) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr Jacky LIM (Chinese version only) 30 September 2014
CB(1)1798/13-14(20) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr KOO Tak-tsai (Chinese version only) 30 September 2014
CB(1)1995/13-14(35) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr LAM Chiu-ying (Chinese version only) 30 September 2014
CB(1)1798/13-14(43) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr MAK Wing-wah (Chinese version only) 30 September 2014
CB(1)1798/13-14(30) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr Samuel TSE (Chinese version only) 30 September 2014
CB(1)1798/13-14(16) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr Simon LEE Siu-po (Chinese version only) 30 September 2014
CB(1)1995/13-14(28) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr Victor LEUNG (Chinese version only) 30 September 2014
CB(1)1995/13-14(32) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr WAN Yuk-shu (Chinese version only) 30 September 2014
CB(1)1798/13-14(44) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr WONG Wai-ying (Chinese version only) 30 September 2014
CB(1)1995/13-14(30) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr YIP Kam-hung (Chinese version only) 30 September 2014
CB(1)1798/13-14(07) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Ms CHAU Chuen-heung, Islands District Council member (Chinese version only) 30 September 2014
CB(1)1995/13-14(26) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Nixon Cleaning Co., Ltd (English version only) 30 September 2014
CB(4)1073/13-14(07) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Park Island Owners' Committee 30 September 2014
CB(1)1798/13-14(18) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Park Island Owners' Committee (Chinese version only) 30 September 2014
CB(1)1798/13-14(10) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Pollution and Protection Services Limited (Chinese version only) 30 September 2014
CB(1)1798/13-14(34) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Raffles Medical Group Hong Kong (English version only) 30 September 2014
CB(1)1995/13-14(19) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from SD Advocates (Chinese version only) 30 September 2014
CB(1)1995/13-14(24) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Serco Group (HK) Ltd. (English version only) 30 September 2014
CB(1)1798/13-14(31) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Sinopec (Hong Kong) Petrol Filling Station Company Limited 30 September 2014
CB(1)1798/13-14(48) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from The American Chamber of Commerce in Hong Kong (English version only) 30 September 2014
CB(1)1995/13-14(36) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from The Chartered Institute of Logistics and Transport in Hong Kong (English version only) 30 September 2014
CB(1)1995/13-14(12) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from the Chinese General Chamber of Commerce (Chinese version only) 30 September 2014
CB(1)1798/13-14(38) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from The Chinese Manufacturers' Association of Hong Kong (Chinese version only) 30 September 2014
CB(4)1073/13-14(04) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from The Hong Kong Institution of Engineers (English version only) 30 September 2014
CB(1)1995/13-14(14) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from the Hong Kong Polytechnic University (English version only) 30 September 2014
CB(1)1798/13-14(33) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Trans-Island Limousine Service Ltd. (English version only) 30 September 2014
CB(1)1798/13-14(22) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Travelex Currency Exchange Limited (English version only) 30 September 2014
CB(1)1995/13-14(25) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Tsuen Wan Community Limited (Chinese version only) 30 September 2014
CB(1)1798/13-14(49) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Tuen Mun Respect for the Aged Association (Chinese version only) 30 September 2014
CB(1)1798/13-14(12) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from AFSC Operations Ltd. (English version only) 7 October 2014
CB(1)1798/13-14(39) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Air Hong Kong (English version only) 7 October 2014
CB(1)1798/13-14(27) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Airline Operators Committee (English version only) 7 October 2014
CB(4)163/14-15(01) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Airport Air Freight Employees' Association (Chinese version only) 7 October 2014
CB(1)1798/13-14(06) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Board of Airline Representatives Hong Kong (English version only) 7 October 2014
CB(1)1798/13-14(13) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Cathay Pacific Airways (English version only) 7 October 2014
CB(1)1798/13-14(25) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Cathay Pacific Airways Local Staff Union (Chinese version only) 7 October 2014
CB(1)1798/13-14(21) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Cathay Pacific Catering Services (HK) Ltd. (English version only) 7 October 2014
CB(1)1798/13-14(23) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Cathay Pacific Local Management Staff Consultative Committee (Chinese version only) 7 October 2014
CB(4)26/14-15(04) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from China Aviation Oil (Hong Kong) Company Limited (Chinese version only) 7 October 2014
CB(1)1995/13-14(09) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Civic Party (Chinese version only) 7 October 2014
CB(4)1073/13-14(05) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Clean Air Network 7 October 2014
CB(4)1107/13-14(01) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Construction Industry Council (English version only) 7 October 2014
CB(4)1107/13-14(02) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Dashun Policy Research Centre (English version only) 7 October 2014
CB(4)1073/13-14(06) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Designing Hong Kong (English version only) 7 October 2014
CB(4)1107/13-14(05) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Friends of the Earth (HK) (Chinese version only) 7 October 2014
CB(4)163/14-15(05) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Green Sense (Chinese version only) 7 October 2014
CB(1)1995/13-14(15) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Greeners Action (Chinese version only) 7 October 2014
CB(1)1798/13-14(09) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Airport Services Limited 7 October 2014
CB(4)1073/13-14(02) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Association of China Travel Organisers Ltd. (Chinese version only) 7 October 2014
CB(4)26/14-15(03) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Association of Travel Agents (English version only) 7 October 2014
CB(1)1995/13-14(03) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Business Aviation Centre Ltd. (English version only) 7 October 2014
CB(1)1798/13-14(04) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Dolphin Conservation Society (English version only) 7 October 2014
CB(1)1995/13-14(16) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Dolphin Conservation Society (English version only) 7 October 2014
CB(1)1798/13-14(15) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Dragon Airlines limited (English version only) 7 October 2014
CB(1)1995/13-14(05) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Fishermen Consortium (Chinese version only) 7 October 2014
CB(1)1798/13-14(14) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong General Chamber of Commerce (English version only) 7 October 2014
CB(1)1798/13-14(08) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Inbound Tour Operators Association (Chinese version only) 7 October 2014
CB(4)1107/13-14(04) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Institute of Urban Design (English version only) 7 October 2014
CB(1)1995/13-14(10) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Institution of Highways and Transportation (English version only) 7 October 2014
CB(4)1107/13-14(03) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Jewellers' and Goldsmiths' Association Ltd. (Chinese version only) 7 October 2014
CB(4)163/14-15(02) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Hong Kong Tourism Board (Chinese version only) 7 October 2014
CB(1)1798/13-14(02) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from International Air Transport Association (English version only) 7 October 2014
CB(4)163/14-15(03) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Lantau Development Alliance (English version only) 7 October 2014
CB(4)26/14-15(02) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Miss Kellie WONG (English version only) 7 October 2014
CB(1)1995/13-14(13) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr Justine TSANG Wen-tien (Chinese version only) 7 October 2014
CB(1)1995/13-14(04) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Mr William CHAN Kit (Chinese version only) 7 October 2014
CB(4)163/14-15(04) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from Save Lantau Alliance (Chinese version only) 7 October 2014
CB(1)1798/13-14(47) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from The Hong Kong Chinese Importers' & Exporters' Association (Chinese version only) 7 October 2014
CB(1)1798/13-14(19) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from The Hong Kong Shippers' Council (Chinese version only) 7 October 2014
CB(4)26/14-15(05) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from the Lion Rock Institute (Chinese version only) 7 October 2014
CB(4)1090/13-14(01) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from United Friendship Taxi Owners and Drivers Association Ltd. (Chinese version only) 7 October 2014
CB(1)1798/13-14(01) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from WWF-Hong Kong 7 October 2014
CB(1)1995/13-14(01) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from WWF-Hong Kong 7 October 2014
CB(4)26/14-15(01) Submission on the Third Runway Project in the Hong Kong International Airport and the relevant Environmental Impact Assessment Report from WWF-Hong Kong (English version only) 7 October 2014


Year 2012 - 2013