Year 2020 - 2021
Year 2019 - 2020
Year 2018 - 2019
Year 2017 - 2018
Year 2016 - 2017



Papers

Cross-boundary traffic


Year 2020 - 2021



LC Paper No.PaperMeeting date
CB(4)390/20-21(01) Administration's paper on 8003QR - Hong Kong-Zhuhai-Macao Bridge - funding support for Main Bridge (Chinese version only) 15 January 2021
CB(4)424/20-21(01) Administration's supplementary information on the agenda item "8003QR - Hong Kong-Zhuhai-Macao Bridge - funding support for Main Bridge" (follow-up paper) 15 January 2021
CB(4)359/20-21(04) Paper prepared by the Legislative Council Secretariat (Background brief) 15 January 2021
CB(4)359/20-21(03) Paper provided by the Administration 15 January 2021


Year 2019 - 2020



LC Paper No.PaperMeeting date
CB(4)1122/18-19(01) Administration's response to item 5 of the Panel's List of follow-up actions regarding "Delayed submission of the Request for Inspection and Survey Checking Forms by the contractor of the Hong Kong Link Road of the Hong Kong-Zhuhai-Macao Bridge" raised at the meeting on 15 February 2019 15 February 2019
25 October 2019
CB(4)1003/18-19(03) Administration's paper on Transport Arrangements Upon the Commissioning of Heung Yuen Wai Boundary Control Point 15 November 2019
CB(4)216/19-20(01) Administration's response to item 4 of the Panel's List of follow-up actions regarding Transport arrangements upon the commissioning of Liantang/Heung Yuen Wai Boundary Control Point" at the meeting on 15 November 2019 15 November 2019
CB(4)136/19-20(01) Administration's response to issues relating to the utilization of the Hong Kong-Zhuhai Macao Bridge raised by Hon LAM Cheuk-ting 20 December 2019


Year 2018 - 2019



LC Paper No.PaperMeeting date
CB(4)165/18-19(01) Joint letter from Hon Jeremy TAM Man-ho and Dr Hon KWOK Kai-ki requesting the Administration to review the re-routing arrangement of airport bus routes via Hong Kong-Zhuhai-Macao Bridge (Chinese version only) 6 November 2018*
CB(4)333/18-19(01)
• Administration's response to letters from Hon Jeremy TAM and Dr Hon KWOK Ka-ki requesting the Administration to review the transport arrangements related to Hong Kong-Zhuhai-Macao Bridge as set out in LC Paper No. CB(4)165/18-19(01) and CB(4)173/18-19(01)
18 January 2019
26 April 2019
CB(4)173/18-19(01) Joint letter from Hon Jeremy TAM Man-ho and Dr Hon KWOK Kai-ki requesting the Administration to review the transport arrangements related to Hong Kong-Zhuhai-Macao Bridge (Chinese version only) 7 November 2018*
CB(4)333/18-19(01)
• Administration's response to letters from Hon Jeremy TAM and Dr Hon KWOK Ka-ki requesting the Administration to review the transport arrangements related to Hong Kong-Zhuhai-Macao Bridge as set out in LC Paper No. CB(4)165/18-19(01) and CB(4)173/18-19(01)
18 January 2019
26 April 2019
CB(4)529/18-19(05) Administration's paper on Delayed submission of the Request for Inspection and Survey Checking Forms by the contractor of the Hong Kong Link Road of the Hong Kong-Zhuhai-Macao Bridge 15 February 2019
CB(4)1122/18-19(01) Administration's response to item 5 of the Panel's List of follow-up actions regarding "Delayed submission of the Request for Inspection and Survey Checking Forms by the contractor of the Hong Kong Link Road of the Hong Kong-Zhuhai-Macao Bridge" raised at the meeting on 15 February 2019 15 February 2019
CB(4)529/18-19(06) Information note on Delayed submission of the Request for Inspection and Survey Checking Forms by the contractor of the Hong Kong Link Road of the Hong Kong-Zhuhai-Macao Bridge prepared by the Legislative Council Secretariat 15 February 2019
CB(4)554/18-19(02) Joint letter from Hon Jeremy TAM Man-ho, Dr Hon KWOK Ka-ki, Hon Tanya CHAN and Hon Alvin YEUNG requesting to discuss issues relating to snapped cable on cross-border Shenzhen Bay Bridge (Chinese version only) 15 March 2019
CB(4)554/18-19(01) Letter from Dr Hon CHENG Chung-tai requesting to hold a special meeting on issues relating to snapped cable on cross-border Shenzhen Bay Bridge (Chinese version only) 15 March 2019
CB(4)1003/18-19(03) Administration's paper on Transport Arrangements Upon the Commissioning of Heung Yuen Wai Boundary Control Point 19 June 2019*
CB(4)1003/18-19(04) Paper on Transport arrangements upon the commissioning of Liantang/Heung Yuen Wai Boundary Control Point prepared by the Legislative Council Secretariat (Background brief) 19 June 2019*
CB(4)1126/18-19(01) Administration's information paper on Investigation on Prestressing Tendon Failure Incident at Concrete Viaduct of Shenzhen Bay Bridge - Hong Kong Section 19 July 2019*


Year 2017 - 2018



LC Paper No.PaperMeeting date
CB(4)52/17-18(01) Letter from Hon LAM Cheuk-ting on the incident at Tuen Mun-Chek Lap Kok Link under the Hong Kong-Zhuhai-Macao Bridge Project on 16 October 2017 (Chinese version only) 20 October 2017
CB(4)374/17-18(01)
• Administration's response to the letter from Hon LAM Cheuk-ting on the incident at Tuen Mun-Chek Lap Kok Link under the Hong Kong-Zhuhai-Macao Bridge Project on 16 October 2017 as set out in LC Paper No. CB(4)52/17-18(01) (Chinese version only)
19 January 2018
CB(4)224/17-18(01) Administration's response to the letter from Hon Claudia MO on the progress of the matters relating to boundary crossing facilities at West Kowloon Station of the Guangzhou-Shenzhen-Hong Kong Express Rail Link 17 November 2017
19 January 2018
CB(4)441/17-18(01) Letter of 2 January 2018 from Administration Wing of Chief Secretary for Administration's Office to the Secretary General of the Legislative Council on the NPCSC's Decision for the implementation of co-location arrangement at the West Kowloon Station 4 January 2018*
CB(4)441/17-18(02) The NPCSC's Decision 4 January 2018*
CB(4)441/17-18(03) The Explanations on the NPCSC's Decision 4 January 2018*
CB(4)441/17-18(04) The approved Co-operation Arrangement 4 January 2018*
CB(4)438/17-18(01) Joint letter dated 2 January 2018 from Hon Jeremy TAM Man-ho, Dr Hon KWOK Ka-ki and Hon Tanya CHAN requesting to discuss the issues relating to the Hong Kong-Zhuhai-Macao Bridge Project (Chinese version only) 19 January 2018
CB(4)438/17-18(02) Joint letter dated 3 January 2018 from Hon CHU Hoi-dick, Hon Charles Peter MOK and Dr Hon Fernando CHEUNG Chiu-hung requesting to discuss the issues relating to the Hong Kong-Zhuhai-Macao Bridge Project (Chinese version only) 19 January 2018
CB(4)356/17-18(01) Letter dated 7 December 2017 from Hon Michael TIEN on "The proposed toll schemes for the Main Bridge of the Hong Kong-Zhuhai-Macao Bridge" (Chinese version only) 19 January 2018
CB(4)639/17-18(01)
• Administration's response to letter from Hon Michael TIEN on "The proposed toll schemes for the Main Bridge of the Hong Kong-Zhuhai-Macao Bridge" as set out in LC Paper No. CB(4)356/17-18(01)
16 March 2018
CB(4)435/17-18(01) Letter dated 28 December 2017 from Hon Claudia MO requesting to discuss the the progress of the Co-location arrangement (Chinese version only) 19 January 2018
CB(4)450/17-18(01) Letter from Hon CHAN Han-pan requesting to discuss the issues relating to the Hong Kong-Zhuhai-Macao Bridge Project (Chinese version only) 19 January 2018
CB(4)640/17-18(01)
• Administration's response to the joint letters from Hon Jeremy TAM Man-ho, Dr Hon KWOK Ka-ki and Hon Tanya CHAN; and Hon CHU Hoi-dick, Hon Charles Peter MOK and Dr Hon Fernando CHEUNG Chiu-hung; and the letter from Hon CHAN Han-pan requesting to discuss the issues relating to the Hong Kong-Zhuhai-Macao Bridge Project as set out in LC Paper Nos. CB(4)438/17-18(01), (02) and CB(4)450/17-18(01)
16 March 2018
CB(4)592/17-18(01) Administration's response to joint letter from Hon Tanya CHAN, Hon Jeremy TAM Man-ho, Dr Hon KWOK Ka-ki and Hon Alvin YEUNG requesting for information on the operating agreement and the latest operational details of the Hong Kong section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link 23 February 2018
CB(4)568/17-18(01) Administration's response to letter from Hon Claudia MO requesting to discuss the progress of the Co-location arrangement 23 February 2018
CB(4)778/17-18(01) Administration's response to the joint letter from Hon Tanya CHAN, Hon Jeremy TAM Man-ho, Dr Hon KWOK Ka-ki and Hon Alvin YEUNG requesting for information on the operating agreement and the latest operational details of the Hong Kong section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link 23 February 2018
CB(4)515/17-18(01) Joint letter from Hon Tanya CHAN, Hon Jeremy TAM Man-ho, Dr Hon KWOK Ka-ki and Hon Alvin YEUNG requesting for information on the operating agreement and the latest operational details of the Hong Kong section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link (Chinese version only) 23 February 2018
CB(4)722/17-18(01) Joint letter dated 9 March 2018 from Hon Tanya CHAN, Hon Jeremy TAM Man-ho, Dr Hon KWOK Ka-ki and Hon Alvin YEUNG on the operational details of the Hong Kong section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link (Chinese version only) 16 March 2018
CB(4)892/17-18(01)
• Administration's response to the joint letter from Hon Tanya CHAN, Hon Jeremy TAM Man-ho, Dr Hon KWOK Ka-ki and Hon Alvin YEUNG on the operational details of the Hong Kong section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link as set out in LC Paper No. CB(4)722/17-18(01)
27 April 2018
CB(4)995/17-18(01) Administration's information about the Western Artificial Island of the Hong Kong-Zhuhai-Macao Bridge Main Bridge (follow-up paper) 27 April 2018*
CB(4)773/17-18(01) Joint letter dated 16 March 2018 from Hon Jeremy TAM Man-ho, Dr Hon KWOK Ka-ki, Hon Tanya CHAN and Hon Alvin YEUNG on transport arrangements of the Hong Kong-Zhuhai-Macao Bridge (Chinese version only) 27 April 2018
CB(4)937/17-18(01)
• Administration's response to the joint letter from Hon Jeremy TAM Man-ho, Dr Hon KWOK Ka-ki, Hon Tanya CHAN and Hon Alvin YEUNG on transport arrangements of the Hong Kong-Zhuhai-Macao Bridge as set out in LC Paper No. CB(4)773/17-18(01)
27 April 2018
18 May 2018
CB(4)869/17-18(01) Joint letter dated 4 April 2018 from Dr Hon KWOK Ka-ki, Hon Jeremy TAM Man-ho, Hon Tanya CHAN and Hon Alvin YEUNG on issues relating to the Hong Kong-Zhuhai-Macao Bridge Project (Chinese version only) 27 April 2018
CB(4)838/17-18(01) Letter dated 26 March 2018 from Hon CHAN Han-pan on transport arrangements of the Hong Kong-Zhuhai-Macao Bridge (Chinese version only) 27 April 2018
CB(4)937/17-18(02)
• Administration's response to the letter from Hon CHAN Han-pan on transport arrangements of the Hong Kong-Zhuhai-Macao Bridge as set out in LC Paper No. CB(4)838/17-18(01)
27 April 2018
18 May 2018
CB(4)869/17-18(02) Letter dated 4 April 2018 from Hon Claudia MO on issues relating to the Hong Kong-Zhuhai-Macao Bridge Project (Chinese version only) 27 April 2018
CB(4)884/17-18(01) Letter dated 6 April 2018 from Hon Jeremy TAM Man-ho on issues relating to the Hong Kong-Zhuhai-Macao Bridge Project (Chinese version only) 27 April 2018
CB(4)916/17-18(01) Letter dated 10 April 2018 from Hon Gary FAN Kwok-wai on issues relating to the Hong Kong-Zhuhai-Macao Bridge Project (Chinese version only) 27 April 2018
CB(4)963/17-18(01)
• Administration's response to the joint letter from Dr Hon KWOK Ka-ki, Hon Jeremy TAM Man-ho, Hon Tanya CHAN and Hon Alvin YEUNG; letter from Hon Claudia MO; letter from Hon Jeremy TAM Man-ho; and letter from Hon Gary FAN Kwok-wai on issues relating to the Hong Kong-Zhuhai-Macao Bridge Project as set out in LC Paper Nos. CB(4)869/17-18(01), (02), CB(4)884/17-18(01) and CB(4)916/17-18(01)
27 April 2018
CB(4)989/17-18(01) Letter dated 23 April 2018 from Hon CHU Hoi-dick on matters relating to the Hong Kong section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link (Chinese version only) 27 April 2018
CB(4)1072/17-18(03) Administration's paper on operational arrangements for the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong Port 18 May 2018
CB(4)1385/17-18(01) Administration's paper on operational arrangements for the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong Port (Follow-up paper) 18 May 2018
CB(4)1555/17-18(01) Administration's paper on operational arrangements for the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong Port (Follow-up paper) 18 May 2018
18 January 2019
CB(4)1105/17-18(01) Letter dated 16 May 2018 from Hon Holden CHOW Ho-ding on ancillary transport facilities on the Hong Kong-Zhuhai-Macao Bridge (Chinese version only) 18 May 2018
CB(4)1208/17-18(01)
• Administration's response to letter dated 16 May 2018 from Hon Holden CHOW Ho-ding on ancillary transport facilities on the Hong Kong-Zhuhai-Macao Bridge as set out in LC Paper No. CB(4)1105/17-18(01)
15 June 2018
CB(4)1072/17-18(04) Paper on the operational arrangements for the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong Port prepared by the Legislative Council Secretariat (background brief) 18 May 2018
CB(4)1407/17-18(05) Administration's paper on recent incidents of water leakage and smoke emission from the pillar box at the basement of the Passenger Clearance Building of the Hong Kong-Zhuhai-Macao Bridge Hong Kong Port 25 July 2018
CB(4)1434/17-18(02) Administration's response to the joint letter from Dr Hon KWOK Ka-ki, Hon Alvin YEUNG, Hon Tanya CHAN and Hon Jeremy TAM requesting to discuss the issues relating to the incidents of Sha Tin to Central Link and to discuss the issue relating to Guangzhou-Shenzhen-Hong Kong Express Rail at the meeting to be held on 20 July 2018 25 July 2018
CB(4)1445/17-18(01) Highways Department's paper on Recent incidents of water leakage and smoke emission from the pillar box at the basement of the Passenger Clearance Building of the Hong Kong-Zhuhai-Macao Bridge Hong Kong Port (power-point presentation material) (Chinese version only) 25 July 2018
CB(4)1407/17-18(06) Information note on recent incidents of water leakage and smoke emission from the pillar box at the basement of the Passenger Clearance Building of the Hong Kong-Zhuhai-Macao Bridge Hong Kong Port prepared by the Legislative Council Secretariat 25 July 2018
CB(4)1434/17-18(01) Joint letter from 24 members requesting to discuss the issues relating to the Guangzhou-Shenzhen-Hong Kong Express Rail Link (Chinese version only) 25 July 2018


Year 2016 - 2017



LC Paper No.PaperMeeting date
CB(4)653/16-17(02) Administration's paper on latest progress of the works of the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong projects (power-point presentation materials) (Chinese version only) 24 February 2017
CB(4)578/16-17(03) Administration's paper on proposals on technical legislative amendments on traffic arrangements for the Hong Kong-Zhuhai-Macao Bridge 24 February 2017
CB(4)653/16-17(01) Administration's paper on proposals on technical legislative amendments on traffic arrangements for the Hong Kong-Zhuhai-Macao Bridge (power-point presentation materials) (Chinese version only) 24 February 2017
CB(4)990/16-17(02) Administration's supplementary information on latest progress of the works of the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong projects (follow-up paper) 24 February 2017
CB(4)1548/16-17(01) Administration's supplementary information on latest progress of the works of the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong projects (follow-up paper) 24 February 2017
CB(4)990/16-17(01) Administration's supplementary information on proposals on technical legislative amendments on traffic arrangements for the Hong Kong-Zhuhai-Macao Bridge (follow-up paper) 24 February 2017
CB(4)621/16-17(02) Information paper on Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road reclamation works provided by Highways Department 24 February 2017
CB(4)584/16-17(01) Information paper on the latest progress of the works of the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong Projects provided by the Administration 24 February 2017
CB(4)598/16-17(01) Joint letter dated 20 February 2017 from Dr Hon KWOK Ka-ki and Hon Jeremy TAM Man-ho on the incident of the collapse of seawalls in the Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road project (Chinese version only) 24 February 2017
CB(4)629/16-17(05) Motion passed under the agenda item of "Latest progress of the works of the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong projects" at the meeting on 24 February 2017 24 February 2017
CB(4)824/16-17(01)
• Administration's response to the motion passed under the agenda item of "Latest progress of the works of the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong projects" at the meeting on 24 February 2017 as set out in LC Paper No. CB(4)629/16-17(05)
24 February 2017
CB(4)598/16-17(02) Letter dated 20 February 2017 from Hon Claudia MO on the incident of the collapse of seawalls in the Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road project (Chinese version only) 24 February 2017
CB(4)598/16-17(03) Letter dated 20 February 2017 from Hon Michael TIEN Puk-sun on the incident of the collapse of seawalls in the Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road project (Chinese version only) 24 February 2017
CB(4)621/16-17(01) Letter dated 23 February 2017 from the Transport and Housing Bureau in response to the letters from Dr Hon KWOK Ka-ki and Hon Jeremy TAM Man-ho, Hon Claudia MO, Hon Michael TIEN Puk-sun and Hon CHU Hoi-dick on the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong projects (Chinese version only) 24 February 2017
CB(4)617/16-17(01) Letter from Hon CHU Hoi-dick on the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong projects (Chinese version only) 24 February 2017
CB(4)578/16-17(04) Paper on transport arrangements of the Hong Kong-Zhuhai-Macao Bridge prepared by the Legislative Council Secretariat (updated background brief) 24 February 2017
CB(4)1140/16-17(01) Administration's paper on follow-up actions by Transport and Housing Bureau and Highways Department on the alleged falsified concrete tests incident 5 June 2017
CB(4)1148/16-17(01) Administration's paper on quality assurance system for use of concrete in public works programme projects 5 June 2017
CB(4)1180/16-17(01) Administration's paper on the Alleged falsification of concrete test reports associated with the works under the Hong Kong-Zhuhai-Macao Bridge Hong Kong and related projects (power-point presentation materials) (Chinese version only) 5 June 2017
CB(4)1180/16-17(02) Administration's paper on the Alleged falsification of concrete test reports associated with the works under the Hong Kong-Zhuhai-Macao Bridge Hong Kong and related projects (power-point presentation materials) (Chinese version only) 5 June 2017
CB(4)1374/17-18(01) Administration's supplementary information on "Alleged falsification of concrete test reports associated with the works under the Hong Kong-Zhuhai-Macao Bridge Hong Kong and related projects" (follow-up paper) 5 June 2017
CB(4)1140/16-17(02) Information note on alleged falsification of concrete test reports associated with the works under the Hong Kong-Zhuhai-Macao Bridge Hong Kong and related projects prepared by the Legislative Council Secretariat 5 June 2017
CB(4)1119/16-17(02) Letter from Dr Hon CHENG Chung-tai on alleged falsification of concrete test reports associated with the works under the Hong Kong-Zhuhai-Macao Bridge Hong Kong and related projects (Chinese version only) 5 June 2017
CB(4)1119/16-17(01) Letter from Dr Hon KWOK Ka-ki on alleged falsification of concrete test reports associated with the works under the Hong Kong-Zhuhai-Macao Bridge Hong Kong and related projects (Chinese version only) 5 June 2017
CB(4)1119/16-17(04) Letter from Hon Jeremy TAM Man-ho on alleged falsification of concrete test reports associated with the works under the Hong Kong-Zhuhai-Macao Bridge Hong Kong and related projects (Chinese version only) 5 June 2017
CB(4)1119/16-17(03) Letter from Hon LAM Cheuk-ting on alleged falsification of concrete test reports associated with the works under the Hong Kong-Zhuhai-Macao Bridge Hong Kong and related projects (Chinese version only) 5 June 2017
CB(4)1164/16-17(01) Speaking note of the Secretary for Transport and Housing on the Alleged falsification of concrete test reports associated with the works under the Hong Kong-Zhuhai-Macao Bridge Hong Kong and related projects (Chinese version only) 5 June 2017
CB(4)1392/16-17(01) Submission from Designing Hong Kong on the traffic implications of the commissioning of the Hong Kong-Zhuhai-Macao Bridge 11 July 2017*
CB(4)1410/16-17(01) Letter dated 10 July 2017 from Dr Hon YIU Chung-yim on the project costs of the Hong Kong-Zhuhai-Macao Bridge Hong Kong Projects (Chinese version only) 13 July 2017*
CB(4)1442/16-17(01)
• Administration's response relating to the project costs of the Hong Kong-Zhuhai-Macao Bridge Hong Kong Projects as set out in LC Paper No. CB(4)1410/16-17(01) (Chinese version only)
21 July 2017*
CB(4)1327/16-17(01) Referral from the Subcommittee on Technical Legislative Amendments on Traffic Arrangements for the Hong Kong-Zhuhai-Macao Bridge (English version only) 21 July 2017
CB(4)1455/16-17(01) Letter dated 20 July 2017 from Dr Hon Fernando CHEUNG Chiu-hung on the co-location arrangements at the West Kowloon Terminus of Hong Kong section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link (Chinese version only) 24 July 2017*
CB(4)1492/16-17(01)
• Administration's response to the letter from Dr Hon Fernando CHEUNG Chiu-hung on the co-location arrangement at the West Kowloon Station of the Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link as set out in LC Paper No. CB(4)1455/16-17(01)
2 August 2017*
CB(4)1505/16-17(01) Administration's response to the letter from Hon Jeremy TAM Man-ho on Customs, Immigration and Quarantine Arrangements of the Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link 8 August 2017
CB(2)1966/16-17(01) Discussion paper on "Customs, Immigration and Quarantine Arrangements of the Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link" provided by the Administration 8 August 2017
CB(4)1499/16-17(01) Letter dated 4 August 2017 from Hon Jeremy TAM Man-ho on Customs, Immigration and Quarantine Arrangements of the Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link (Chinese version only) 8 August 2017
CB(4)1510/16-17(01) Letter dated 8 August 2017 from Dr Hon Fernando CHEUNG Chiu-hung on the Customs, Immigration and Quarantine Arrangements of the Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link (Chinese version only) 8 August 2017
CB(4)1612/16-17(01)
• Administration's response to the letter from Dr Hon Fernando CHEUNG Chiu-hung on the Customs, Immigration and Quarantine Arrangements of the Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link as set out in LC Paper No. CB(4)1510/16-17(01)
8 August 2017
CB(4)1509/16-17(01) Motion passed under the agenda item of "Customs, Immigration and Quarantine Arrangements of the Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link" at the meeting on 8 August 2017 8 August 2017
CB(4)1565/16-17(01)
• Administration's response to the motion passed under the agenda item of "Customs, Immigration and Quarantine Arrangements of the Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link" at the meeting on 8 August 2017 as set out in LC Paper No. CB(4)1509/16-17(01)
8 August 2017
CB(4)1496/16-17(01) Paper on customs, immigration and quarantine arrangements of the Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link prepared by the Legislative Council Secretariat (background brief) 8 August 2017


* Issue date