Capital Works Reserve Fund

HEAD 707 New Towns and Urban Area Development

Civil Engineering - Land development


Year 2020 - 2021



LC Paper No.PaperMeeting date
PWSC(2020-21)16 765CL - Development of Anderson Road Quarry site - remaining pedestrian connectivity facilities works 4 November 2020
18 November 2020
PWSC(2020-21)20 760CL - Development of Lok Ma Chau Loop - main works package 1; and 178BF - Fire Station and Ambulance Depot with Departmental Accommodations in Lok Ma Chau Loop 9 December 2020
PWSC(2020-21)24 786CL - Tung Chung New Town Extension; 782CL - Engineering Study on Road P1 (Tai Ho - Sunny Bay Section); and 49CG - The District Cooling System for Tung Chung New Town Extension (East) 16 December 2020
6 January 2021
13 January 2021
PWSC73/20-21(01) Administration's response to the request made by members at the meeting on 13 January 2021 for supplementary information about PWSC(2020-21)24 - 786CL - Tung Chung New Town Extension; 782CL - Engineering Study on Road P1 (Tai Ho - Sunny Bay Section); and 49CG - The District Cooling System for Tung Chung New Town Extension (East) 13 January 2021
PWSC(2020-21)34 332CL - West Kowloon Reclamation - main works (remainder) - footbridge at the junction of Sham Mong Road and Yen Chow Street West in Sham Shui Po 24 February 2021
PWSC(2021-22)9 87MM - New Acute Hospital at Kai Tak Development Area; 3MI - Expansion of North District Hospital; 114MH - Expansion of Lai King Building in Princess Margaret Hospital; and 702CL - Kai Tak development - remaining infrastructure works for developments at the former runway and south apron 28 April 2021
12 May 2021
PWSC139/20-21(01) Administration's response to the request made by members at the meeting on 12 May 2021 for supplementary information about PWSC(2021-22)9 - 87MM - New Acute Hospital at Kai Tak Development Area; 3MI - Expansion of North District Hospital; 114MH - Expansion of Lai King Building in Princess Margaret Hospital; and 702CL - Kai Tak development - remaining infrastructure works for developments at the former runway and south apron 12 May 2021
PWSC(2021-22)26 852CL - First Phase Development of the New Territories North - San Tin / Lok Ma Chau Development Node; and 854CL - Remaining Phase Development of the New Territories North (NTN) - planning and engineering study for NTN New Town and Man Kam To 30 June 2021
PWSC153/20-21(01) Submission from the WWF - Hong Kong on PWSC(2021-22)26 - 852CL - First Phase Development of the New Territories North - San Tin / Lok Ma Chau Development Node; and 854CL - Remaining Phase Development of the New Territories North (NTN) - planning and engineering study for NTN New Town and Man Kam To 30 June 2021
PWSC162/20-21(01) Administration's response to the request made by members at the meeting on 30 June 2021 for supplementary information about PWSC(2021-22)26 - 852CL - First Phase Development of the New Territories North-San Tin / Lok Ma Chau Development Node; and 854CL - Remaining Phase Development of the New Territories North (NTN) - Planning and Engineering Study for NTN New Town and Man Kam To 30 June 2021


Year 2019 - 2020



LC Paper No.PaperMeeting date
PWSC(2019-20)19 Kai Tak development - remaining infrastructure works for developments at the former runway and south apron 19 June 2019
6 November 2019
13 November 2019
20 November 2019
PWSC50/19-20(01) Administration's response to the request made by members at the meeting on 20 November 2019 for supplementary information about PWSC(2019-20)19 - 702CL - Kai Tak development - remaining infrastructure works for developments at the former runway and south apron 20 November 2019
PWSC(2019-20)22 Tseung Kwan O further development - infrastructure works for Tseung Kwan O Stage 1 landfill site 19 June 2019
6 November 2019
13 November 2019
20 November 2019
27 November 2019
PWSC39/20-21(01) Administration's response to the request made by members at the meeting on 27 November 2019 for supplementary information about PWSC(2019-20)22 - 716CL - Tseung Kwan O further development - infrastructure works for Tseung Kwan O Stage 1 landfill site 27 November 2019
PWSC(2019-20)16 West Kowloon Reclamation - main works (remainder) 19 June 2019
27 November 2019
4 December 2019
11 December 2019
15 January 2020
PWSC68/19-20(01) Administration's response to the request made by members at the meeting on 11 December 2019 for supplementary information about PWSC(2019-20)16 - 332CL - West Kowloon Reclamation - main works (remainder) 11 December 2019
15 January 2020
PWSC70/19-20(01) Submission from Rehabilitation Alliance Hong Kong on PWSC(2019-20)16 - 332CL - West Kowloon Reclamation - main works (remainder) (Chinese version only) 15 January 2020
PWSC173/19-20(01) Administration's response to the request made by members at the meeting on 15 January 2020 for supplementary information about PWSC(2019-20)16 - 332CL - West Kowloon Reclamation - main works (remainder) 15 January 2020
PWSC(2019-20)24 Hung Shui Kiu/Ha Tsuen New Development Area advance works - site formation and engineering infrastructure; Hung Shui Kiu/Ha Tsuen New Development Area stage 1 works - site formation and engineering infrastructure; Hung Shui Kiu/Ha Tsuen New Development Area stage 2 works - site formation and engineering infrastructure; and Special Ex-gratia Cash Allowance for the First Phase development for the Hung Shui Kiu/Ha Tsuen New Development Area 22 January 2020
26 February 2020
18 March 2020
25 March 2020
29 April 2020
11 May 2020
13 May 2020
PWSC174/19-20(01) Administration's response to the request made by members at the meeting on 11 May 2020 for supplementary information about PWSC(2019-20)24 - 787CL - Hung Shui Kiu/Ha Tsuen New Development Area advance works - site formation and engineering infrastructure; 796CL - Hung Shui Kiu/Ha Tsuen New Development Area stage 1 works - site formation and engineering infrastructure; 829CL - Hung Shui Kiu/Ha Tsuen New Development Area stage 2 works - site formation and engineering infrastructure; and 38CA - Special Ex-gratia Cash Allowance for the First Phase development for the Hung Shui Kiu/Ha Tsuen New Development Area 11 May 2020
PWSC(2019-20)28 Community hall, general outpatient clinic and maternal and child health centre at Ching Hong Road, Tsing Yi; Site formation and infrastructure works for public housing developments at Pok Fu Lam South; Site formation and infrastructure works for public housing developments at Pik Wan Road, Yau Tong; Formation, roads and drains in Area 54, Tuen Mun - phase 1 stage 2; and Formation, roads and drains in Area 54, Tuen Mun - phase 2 29 April 2020
11 May 2020
13 May 2020
27 May 2020
1 June 2020
10 June 2020
PWSC162/19-20(01) Administration's response to the request made by members at the meeting on 1 June 2020 for supplementary information about PWSC(2019-20)28 - 191GK - Community hall, general outpatient clinic and maternal and child health centre at Ching Hong Road, Tsing Yi; 795CL - Site formation and infrastructure works for public housing developments at Pok Fu Lam South; 812CL - Site formation and infrastructure works for public housing developments at Pik Wan Road, Yau Tong; 666CL - Formation, roads and drains in Area 54, Tuen Mun - phase 1 stage 2; and 681CL - Formation, roads and drains in Area 54, Tuen Mun - phase 2 10 June 2020


Year 2018 - 2019



LC Paper No.PaperMeeting date
PWSC(2018-19)29 Kai Tak development - remaining infrastructure works for developments at the former runway and south apron 24 October 2018
PWSC26/18-19(01) Administration's response to the request made by members at the meeting on 24 October 2018 for supplementary information about PWSC(2018-19)29 - 702CL - Kai Tak development - remaining infrastructure works for developments at the former runway and south apron 24 October 2018
PWSC(2018-19)41 Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; Site formation and infrastructure works for Police facilities in Kong Nga Po; Shek Wu Hui Effluent Polishing Plant; and Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area 20 February 2019
27 February 2019
18 March 2019
20 March 2019
PWSC119/18-19(02) Written questions from Hon CHU Hoi-dick regarding PWSC(2018-19)41 - 747CL - Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 759CL - First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; 828CL - Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 793CL - Site formation and infrastructure works for Police facilities in Kong Nga Po; 388DS - Shek Wu Hui Effluent Polishing Plant; and 37CA - Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area (Chinese version only) 20 February 2019
PWSC126/18-19(03) Administration's response to the written questions from Hon CHU Hoi-dick regarding PWSC(2018-19)41 - 747CL - Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 759CL - First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; 828CL - Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 793CL - Site formation and infrastructure works for Police facilities in Kong Nga Po; 388DS - Shek Wu Hui Effluent Polishing Plant; and 37CA - Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area 20 February 2019
PWSC126/18-19(04) Letter from Hon CHAN Chi-chuen to the Chairman dated 18 February 2019 regarding PWSC(2018-19)41 PWSC(2018-19)41 - 747CL - Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 759CL - First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; 828CL - Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 793CL - Site formation and infrastructure works for Police facilities in Kong Nga Po; 388DS - Shek Wu Hui Effluent Polishing Plant; and 37CA - Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area (Chinese version only) 20 February 2019
PWSC137/18-19(01) Submission from deputations (受發展影響漁農戶聯會) on PWSC(2018-19)41 - 747CL - Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 759CL - First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; 828CL - Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 793CL - Site formation and infrastructure works for Police facilities in Kong Nga Po; 388DS - Shek Wu Hui Effluent Polishing Plant; and 37CA - Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area (Chinese version only) 27 February 2019
PWSC150/18-19(01) Administration's response to the request made by members at the meeting on 27 February 2019 for supplementary information about PWSC(2018-19)41 - 747CL - Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 759CL - First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; 828CL - Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 793CL - Site formation and infrastructure works for Police facilities in Kong Nga Po; 388DS - Shek Wu Hui Effluent Polishing Plant; and 37CA - Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area 18 March 2019
20 March 2019
PWSC145/18-19(01) Written questions from Hon Gary FAN Kwok-wai regarding PWSC(2018-19)41 - 747CL - Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 759CL - First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; 828CL - Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 793CL - Site formation and infrastructure works for Police facilities in Kong Nga Po; 388DS - Shek Wu Hui Effluent Polishing Plant; and 37CA - Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area (Chinese version only) 18 March 2019
20 March 2019
PWSC150/18-19(02) Administration's response to the written questions from Hon Gary FAN Kwok-wai regarding PWSC(2018-19)41 - 747CL - Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 759CL - First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; 828CL - Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 793CL - Site formation and infrastructure works for Police facilities in Kong Nga Po; 388DS - Shek Wu Hui Effluent Polishing Plant; and 37CA - Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area 18 March 2019
20 March 2019
PWSC147/18-19(01) Second batch of written questions from Hon CHU Hoi-dick regarding PWSC(2018-19)41 - 747CL - Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 759CL - First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; 828CL - Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 793CL - Site formation and infrastructure works for Police facilities in Kong Nga Po; 388DS - Shek Wu Hui Effluent Polishing Plant; and 37CA - Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area (Chinese version only) 18 March 2019
20 March 2019
PWSC180/18-19(01) Administration's response to the second batch of written questions from Hon CHU Hoi-dick regarding PWSC(2018-19)41 - 747CL - Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 759CL - First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; 828CL - Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 793CL - Site formation and infrastructure works for Police facilities in Kong Nga Po; 388DS - Shek Wu Hui Effluent Polishing Plant; and 37CA - Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area 18 March 2019
20 March 2019
PWSC152/18-19(01) Submission from deputation (馬寶寶社區農場) on PWSC(2018-19)41 - 747CL - Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 759CL - First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; 828CL - Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 793CL - Site formation and infrastructure works for Police facilities in Kong Nga Po; 388DS - Shek Wu Hui Effluent Polishing Plant; and 37CA - Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area (Chinese version only) 18 March 2019
20 March 2019
PWSC179/18-19(01) Administration's response to the request made by members at the meeting on 18 March 2019 for supplementary information about PWSC(2018-19)41 - 747CL - Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 759CL - First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; 828CL - Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 793CL - Site formation and infrastructure works for Police facilities in Kong Nga Po; 388DS - Shek Wu Hui Effluent Polishing Plant; and 37CA - Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area (Part 1 of 5) 18 March 2019
PWSC179/18-19(01) Administration's response to the request made by members at the meeting on 18 March 2019 for supplementary information about PWSC(2018-19)41 - 747CL - Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 759CL - First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; 828CL - Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 793CL - Site formation and infrastructure works for Police facilities in Kong Nga Po; 388DS - Shek Wu Hui Effluent Polishing Plant; and 37CA - Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area (Part 2 of 5) 18 March 2019
PWSC179/18-19(01) Administration's response to the request made by members at the meeting on 18 March 2019 for supplementary information about PWSC(2018-19)41 - 747CL - Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 759CL - First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; 828CL - Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 793CL - Site formation and infrastructure works for Police facilities in Kong Nga Po; 388DS - Shek Wu Hui Effluent Polishing Plant; and 37CA - Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area (Part 3 of 5) 18 March 2019
PWSC179/18-19(01) Administration's response to the request made by members at the meeting on 18 March 2019 for supplementary information about PWSC(2018-19)41 - 747CL - Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 759CL - First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; 828CL - Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 793CL - Site formation and infrastructure works for Police facilities in Kong Nga Po; 388DS - Shek Wu Hui Effluent Polishing Plant; and 37CA - Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area (Part 4 of 5) 18 March 2019
PWSC179/18-19(01) Administration's response to the request made by members at the meeting on 18 March 2019 for supplementary information about PWSC(2018-19)41 - 747CL - Advance site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 759CL - First stage of site formation and engineering infrastructure at Kwu Tung North new development area and Fanling North new development area; 828CL - Remaining phase of site formation and engineering infrastructure works at Kwu Tung North new development area and Fanling North new development area; 793CL - Site formation and infrastructure works for Police facilities in Kong Nga Po; 388DS - Shek Wu Hui Effluent Polishing Plant; and 37CA - Special Ex-gratia Cash Allowance for the Kwu Tung North and Fanling North New Development Area (Part 5 of 5) 18 March 2019
PWSC(2018-19)46 Relocation of supporting operational facilities of Tsim Sha Tsui Fire Station Complex, Fire Services Club and other Fire Services accommodations to To Wah Road, Kowloon; Infrastructure Works for West Kowloon Cultural District, phase 1; and Integrated Basement for West Kowloon Cultural District - remaining works 27 March 2019
29 March 2019
9 April 2019
17 April 2019
26 April 2019
8 May 2019
14 May 2019
PWSC204/18-19(01) Written questions from Dr Hon KWOK Ka-ki, Hon Alvin YEUNG, Hon Tanya CHAN and Hon Jeremy TAM Man-ho regarding PWSC(2018-19)46 - 754CL - Infrastructure Works for West Kowloon Cultural District, phase 1 (Chinese version only) 14 May 2019
PWSC208/18-19(03) Administration's response to the written questions from Dr Hon KWOK Ka-ki, Hon Alvin YEUNG, Hon Tanya CHAN and Hon Jeremy TAM Man-ho regarding PWSC(2018-19)46 - 754CL - Infrastructure Works for West Kowloon Cultural District, phase 1 14 May 2019
PWSC204/18-19(02) Written questions from Dr Hon KWOK Ka-ki regarding PWSC(2018-19)46 - 763CL - Integrated Basement for West Kowloon Cultural District - remaining works (Chinese version only) 14 May 2019
PWSC208/18-19(04) Administration's response to the written questions from Dr Hon KWOK Ka-ki regarding PWSC(2018-19)46 - 763CL - Integrated Basement for West Kowloon Cultural District - remaining works 14 May 2019
PWSC204/18-19(03) Written questions from Dr Hon Helena WONG Pik-wan regarding PWSC(2018-19)46 175BF - Relocation of supporting operational facilities of Tsim Sha Tsui Fire Station Complex, Fire Services Club and other Fire Services accommodations to To Wah Road, Kowloon (Chinese version only) 14 May 2019
PWSC208/18-19(02) Administration's response to the written questions from Dr Hon Helena WONG Pik-wan regarding PWSC(2018-19)46 - 175BF - Relocation of supporting operational facilities of Tsim Sha Tsui Fire Station Complex, Fire Services Club and other Fire Services accommodations to To Wah Road, Kowloon 14 May 2019
PWSC208/18-19(01) Administration's response to the request made by members at the meeting on 8 May 2019 for supplementary information about PWSC(2018-19)46 - 175BF - Relocation of supporting operational facilities of Tsim Sha Tsui Fire Station Complex, Fire Services Club and other Fire Services accommodations to To Wah Road, Kowloon; 754CL - Infrastructure Works for West Kowloon Cultural District, phase 1; and 763CL - Integrated Basement for West Kowloon Cultural District - remaining works 14 May 2019
PWSC278/18-19(01) Administration's response to the request made by members at the meeting on 14 May 2019 for supplementary information about PWSC(2018-19)46 - 175BF - Relocation of supporting operational facilities of Tsim Sha Tsui Fire Station Complex, Fire Services Club and other Fire Services accommodations to To Wah Road, Kowloon; 754CL - Infrastructure Works for West Kowloon Cultural District, phase 1; and 763CL - Integrated Basement for West Kowloon Cultural District - remaining works 14 May 2019
PWSC(2018-19)43 The Establishment of an Agricultural Park in Kwu Tung South 27 March 2019
29 March 2019
9 April 2019
17 April 2019
26 April 2019
PWSC164/18-19(01) Written questions from Hon CHU Hoi-dick regarding PWSC(2018-19)43 - 471RO - The Establishment of an Agricultural Park in Kwu Tung South (Chinese version only) 9 April 2019
PWSC171/18-19(01) Administration's response to the written questions from Hon CHU Hoi-dick regarding PWSC(2018-19)43 - 471RO - The Establishment of an Agricultural Park in Kwu Tung South 9 April 2019
PWSC(2019-20)6 Kai Tak development - infrastructure at north apron area of Kai Tak Airport 17 May 2019
22 May 2019
25 May 2019
PWSC222/18-19(01) Written questions from Hon Gary FAN Kwok-wai regarding PWSC(2019-20)6 and PWSC(2019-20)7 and his request on swapping the order of these two agenda items (Chinese version only) 22 May 2019
25 May 2019
PWSC225/18-19(01) Administration's response to Hon Gary FAN Kwok-wai's request for swapping the order of agenda items PWSC(2019-20)6 and PWSC(2019-20)7 on the agenda of the meeting on 25 May 2019 (Chinese version only) 22 May 2019
25 May 2019
PWSC226/18-19(01) Administration's response to the written questions from Hon Gary FAN Kwok-wai regarding PWSC(2019-20)6 - 469CL - Kai Tak development - infrastructure at north apron area of Kai Tak Airport 22 May 2019
25 May 2019
PWSC226/18-19(02) Traffic Review Report of "Further Review of Development Intensity Study for Kai Tak" 22 May 2019
25 May 2019
PWSC263/18-19(01) Administration's response to the request made by members at the meeting on 25 May 2019 for supplementary information about PWSC(2019-20)6 - 469CL - Kai Tak development - infrastructure at north apron area of Kai Tak Airport 25 May 2019
PWSC(2019-20)19 Kai Tak development - remaining infrastructure works for developments at the former runway and south apron 19 June 2019
6 November 2019
13 November 2019
20 November 2019
PWSC(2019-20)22 Tseung Kwan O further development - infrastructure works for Tseung Kwan O Stage 1 landfill site 19 June 2019
6 November 2019
13 November 2019
20 November 2019
27 November 2019
PWSC(2019-20)16 West Kowloon Reclamation - main works (remainder) 19 June 2019
27 November 2019
4 December 2019
11 December 2019
15 January 2020


Year 2017 - 2018



LC Paper No.PaperMeeting date
PWSC(2017-18)21 Development of Anderson Road Quarry Site 18 October 2017
1 November 2017
15 November 2017
29 November 2017
PWSC34/17-18(01) Administration's response to the requests made by members at the meeting on 15 November 2017 for supplementary information about PWSC(2017-18)21 15 November 2017
29 November 2017
PWSC38/17-18(01) Written questions from Hon CHU Hoi-dick regarding PWSC(2017-18)21 - 765CL - Development of Anderson Road Quarry Site (Chinese version only) 29 November 2017
PWSC79/17-18(02) Administration's response to the written questions raised by Hon CHU Hoi-dick regarding PWSC(2017-18)21 29 November 2017
PWSC79/17-18(01) Administration's response to the requests made by members at the meeting on 29 November 2017 for supplementary information about PWSC(2017-18)21 29 November 2017
PWSC(2017-18)27 Infrastructure Works for West Kowloon Cultural District, phase 1 8 January 2018
17 January 2018
22 January 2018
29 January 2018
31 January 2018
6 February 2018
PWSC123/17-18(01) Administration's response to the request made by members at the meeting on 6 February 2018 for supplementary information about PWSC(2017-18)27 - 754CL - Infrastructure Works for West Kowloon Cultural District, phase 1 6 February 2018
PWSC(2017-18)34 Development of Lok Ma Chau Loop - land decontamination and advance engineering works; and 760CL - Development of Lok Ma Chau Loop - Main Works Package 1 12 February 2018
19 March 2018
21 March 2018
28 March 2018
11 April 2018
PWSC158/17-18(01) Written questions from Hon WU Chi-wai regarding PWSC(2017-18)34 - 748CL - Development of Lok Ma Chau Loop - land decontamination and advance engineering works; and 760CL - Development of Lok Ma Chau Loop - Main Works Package 1 (Chinese version only) 11 April 2018
PWSC158/17-18(02) Written questions from Hon CHU Hoi-dick regarding PWSC(2017-18)34 - 748CL - Development of Lok Ma Chau Loop - land decontamination and advance engineering works; and 760CL - Development of Lok Ma Chau Loop - Main Works Package 1 (Chinese version only) 11 April 2018
PWSC166/17-18(01) Administration's response to (i) the request made by members at the meeting on 28 March 2018 for supplementary information and (ii) the written questions from Hon WU Chi-wai and Hon CHU Hoi-dick about PWSC(2017-18)34 - 748CL - Development of Lok Ma Chau Loop - land decontamination and advance engineering works; and 760CL - Development of Lok Ma Chau Loop - Main Works Package 1 11 April 2018
PWSC(2018-19)17 Site formation and infrastructure works for development at Kam Tin South, Yuen Long - advance works 19 May 2018
PWSC249/17-18(01) Administration's response to the request made by members at the meeting on 19 May 2018 for supplementary information regarding PWSC(2018-19)17 - 804CL - Site formation and infrastructure works for development at Kam Tin South, Yuen Long - advance works 19 May 2018


Year 2016 - 2017



LC Paper No.PaperMeeting date
PWSC(2017-18)3 Tung Chung New Town Extension 6 May 2017
10 May 2017
17 May 2017
20 May 2017
31 May 2017
7 June 2017
10 June 2017
PWSC171/16-17(01) Written questions from Hon CHU Hoi-dick regarding PWSC(2017-18)3 - 786CL - Tung Chung New Town Extension (Chinese version only) 31 May 2017
PWSC184/16-17(01) Administration's response to the written questions raised by Hon CHU Hoi-dick regarding PWSC(2017-18)3 - 786CL - Tung Chung New Town Extension 31 May 2017
PWSC177/16-17(01) Submission from Green Sense on PWSC(2017-18)3 - 786CL - Tung Chung New Town Extension (Chinese version only) 31 May 2017
PWSC190/16-17(01) Administration's response to the request made by members at the meeting on 31 May 2017 for supplementary information about PWSC(2017-18)3 - 786CL - Tung Chung New Town Extension 7 June 2017
PWSC190/16-17(02) Second batch of written questions raised by Hon CHU Hoi-dick regarding PWSC(2017-18)3 - 786CL - Tung Chung New Town Extension (Chinese version only) 7 June 2017
PWSC192/16-17(02) Administration's response to the second batch of written questions raised by Hon CHU Hoi-dick regarding PWSC(2017-18)3 - 786CL - Tung Chung New Town Extension 10 June 2017
PWSC6/17-18(01) Final report of the Planning and Engineering Study on the Remaining Development in Tung Chung - Feasibility Study provided by the Administration regarding PWSC(2017-18)3 - 786CL - Tung Chung New Town Extension (English version only) 10 June 2017
PWSC192/16-17(01) Administration's response to the request made by members at the meeting on 7 June 2017 for supplementary information about PWSC(2017-18)3 - 786CL - Tung Chung New Town Extension 10 June 2017
PWSC192/16-17(03) Written questions raised by Dr Hon LAU Siu-lai regarding PWSC(2017-18)3 - 786CL - Tung Chung New Town Extension (Chinese version only) 10 June 2017
PWSC229/16-17(01) Administration's response to the written questions raised by Dr Hon LAU Siu-lai regarding PWSC(2017-18)3 - 786CL - Tung Chung New Town Extension 10 June 2017
PWSC223/16-17(01) Administration's response to the request made by members at the meeting on 10 June 2017 for supplementary information about PWSC(2017-18)3 - 786CL - Tung Chung New Town Extension 10 June 2017
PWSC(2017-18)12 Integrated Basement for West Kowloon Cultural District 24 June 2017
28 June 2017
4 July 2017
PWSC240/16-17(01) Written questions from Hon CHU Hoi-dick regarding PWSC(2017-18)12 (Chinese version only) 4 July 2017
PWSC240/16-17(02) Second batch of written questions from Hon CHU Hoi-dick regarding PWSC(2017-18)12 (Chinese version only) 4 July 2017
PWSC31/17-18(02) Administration's response to the first batch and second batch of written questions from Hon CHU Hoi-dick regarding PWSC(2017-18)12 4 July 2017
PWSC31/17-18(01) Administration's response to the requests made by members at the meeting on 4 July 2017 for supplementary information about PWSC(2017-18)12 4 July 2017
PWSC(2017-18)14 Development of Anderson Road Quarry Site 28 June 2017
4 July 2017