Second Report of the Select Committee
on Building Problems of Public Housing Units
May 2004

The Select Committee makes two reports on building problems of public housing units. This is the second of such reports. The Second Report comprises three volumes as follows:

Volume I
Main report including the minutes of proceedings

Volumes IIA to IIB
Minutes of evidence comprising the verbatim transcripts, in their original language, of the public hearings


Volume I - Main Report

Table of Contents

ChapterPage
I.Introduction1 - 3

II.Tin Chung Court incident - Background and management structure

Background4 - 6

Management structure for the project6 - 13

III.Tin Chung Court - Planning and design

Ground conditions of the Tin Chung Court site14 - 15

Piling design15 - 24

IV.Tin Chung Court - Construction

Work stages and technical requirements25- 39

Supervision of works on site40 - 44

V.Tin Chung Court - Verification of piling design45 - 53

VI.Tin Chung Court - Division of responsibilities in quality assurance54 - 59

VII.Conclusions and recommendations on the Tin Chung Court incident

General Conclusions60 - 70

Responsibility of the parties concerned70 - 75

Concluding remarks75 - 76

Further recommendations76 - 80

Acknowledgement81

Signatures of Members of the Select Committee82 - 83

Abbreviations87 - 89


Page
Appendices
Appendix 1Membership list93

Appendix 2List of Witnesses Appearing before the Select Committee to Give Evidence in Relation to Tin Shui Wai Area 31 Phase 1 Incident94 - 96

Appendix 3Tin Shui Wai Area 31 Phase 1 General Layout Plan97

Appendix 4Chronology of Important Activities Relating to Tin Shui Wai Area 31 Phase 1 Piling Contract98 - 101

Appendix 5Summary of the Results of Investigatory Works to Ascertain the Founding Depths of a Number of Piles at Blocks 1 and 2102

Appendix 6Organization Chart Showing the Key Personnel Responsible for Piling Contract No. 36/96 Tin Shui Wai Area 31 Phase 1 103

Appendix 7Chronology of the Recruitment of Resident Engineer for Tin Shui Wai Area 31 Phase 1104 - 106

Appendix 8Locations of the 53 Boreholes Sunk by Acer Consultants (Far East) Ltd.107

Appendix 9The Layers of Soil underneath Blocks 1 and 2 according to the Acer Report108 - 109

Appendix 10Locations of the 24 Boreholes Numbering HY1 to HY24110

Appendix 11Static Calculations for Piling Design of Block 1111 - 114

Appendix 12Particular Specification 19.43115

Appendix 13Locations of Preliminary Piles116

Appendix 14Sequence of Final Set of Piles in Block 1117

Appendix 15Locations of Boreholes Used in Calculating Settlement of Block 2118

Lists of Written Evidence121 - 139

Minutes of Proceedings143 - 148


Volumes IIA to IIB - Minutes of evidence of public hearings

Table of Contents

DatePublic HearingsWitnessVolume
The 1st to 19th hearings are in relation to Policies and Working Mechanismsfor the Production of Housing Units Subject to and Exempted fromthe Buildings Ordinance which are not covered by the Second Report.
11 September 200120 Mr Stephen POON Sing-chi
Former Senior Assistant Director/New Development Housing Department
IIA

13 September 200121Part I
Mr Stephen POON Sing-chi
Former Senior Assistant Director/New Development Housing Department
IIA
Part II
Ir Alan CLOVER
Ir Rupert LEUNG Kwok-yiu

Representatives of Hyder Consulting Ltd
(formerly known asAcer Consultants (Far East) Ltd)
IIA

18 September 200122 Mr Joseph KONG Churk-fan
Chief Architect for Tin Shui Wai Area 31 Phase 1 project
IIA

20 September 200123 Mr YUEN Tze-chu
Director's Representative for Tin Shui Wai Area 31 Phase 1 project
IIA

25 September 200124 Part I
Mr Tommy IP Kwok-wing
Quantity Surveyor for Tin Shui Wai Area 31 Phase 1 project
IIA
Part II
Mr David LEE Sai-cheung
Chief Structural Engineer for Tin Shui Wai Area 31 Phase 1 project
IIA

27 September 200125 Mr David LEE Sai-cheung
Chief Structural Engineer for Tin Shui Wai Area 31 Phase 1 project
IIA
The 26th hearing was held in camera.
9 October 200127 Part I
Mr Joseph HO
Mr Conrad CHENG Yuk-keg

Representatives of Hsin Yieh Architects & Associates Ltd
IIB
Part II
Mr NG Hon-keung
Mr MAK Lap-ming

Representatives of Joseph Chow & Partners Limited
(JMK Consulting Engineers)
IIB

16 October 200128Mr HO Sau-him
Director's Representative for Tin Shui Wai Area 31 Phase 1 project
IIB

The 29th hearing was held in camera.
23 October 200130 Part I
Mrs Rosa HO LOK So-fun
Liaison Senior Architect for Tin Shui Wai Area 31 Phase 1 project
Ms Rosman WAI Chui-chi
Liaison Senior Architect for Tin Shui Wai Area 31 Phase 1 project
Mr LI Kar-fai Liaison
Architect for Tin Shui Wai Area 31 Phase 1 project
IIB
Part II
Mr Francis LEE Kam-chuen
Liaison Senior Structural Engineer for Tin Shui Wai Area 31 Phase 1 project
IIB
The 31st hearing was held in camera.
30 October 200132Mr Chezy TANG Wai-chau
Former Project Structural Director Hsin Yieh Architects & Associates Ltd
IIB

3 November 200133Mr NG Hon-keung
Mr MAK Lap-ming

Representatives of Joseph Chow & Partners Limited
(JMK Consulting Engineers)
IIB

The 34th to 35th hearings were held in camera.
13 November 200136Part I
Mr SUEN Pak-chiu
Geotechnical Engineer for Tin Shui Wai Area 31 Phase 1 project
IIB
Part II
Mr WONG Chi-ming
Representative ofC M Wong & Associates Ltd
IIB

The 37th hearing was held in camera.
20 November 200138Mr NG Hon-keung
Mr MAK Lap-ming

Representatives of Joseph Chow & Partners Limited
(JMK Consulting Engineers)
IIB
The 39th to 41st hearings were held in camera.
The 42th to 64th and 68th hearings are in relation to Shatin Area 14B Phase 2, Shek Yam Estate Phase 2 and Tung Chung Area 30 Phase 3 projects which are not covered by the Second Report.
The 65th to 67th and 69th hearings are in relation to Policies and Working Mechanisms for the Production of Housing Units Subject to and Exempted from the Buildings Ordinance which are not covered by the Second Report.
The 70th hearing was held in camera.