The Select Committee makes two reports on building problems of public housing units. This is the second of such reports. The Second Report comprises three volumes as follows:
Minutes of evidence comprising the verbatim transcripts, in their original language, of the public hearings
| | Page
|
Appendices | |
|
Appendix 1 | Membership list | 93
|
Appendix 2 | List of Witnesses Appearing before the Select Committee to Give Evidence in Relation to Tin Shui Wai Area 31 Phase 1 Incident | 94 - 96
|
Appendix 3 | Tin Shui Wai Area 31 Phase 1 General Layout Plan | 97
|
Appendix 4 | Chronology of Important Activities Relating to Tin Shui Wai Area 31 Phase 1 Piling Contract | 98 - 101
|
Appendix 5 | Summary of the Results of Investigatory Works to Ascertain the Founding Depths of a Number of Piles at Blocks 1 and 2 | 102
|
Appendix 6 | Organization Chart Showing the Key Personnel Responsible for Piling Contract No. 36/96 Tin Shui Wai Area 31 Phase 1 | 103
|
Appendix 7 | Chronology of the Recruitment of Resident Engineer for Tin Shui Wai Area 31 Phase 1 | 104 - 106
|
Appendix 8 | Locations of the 53 Boreholes Sunk by Acer Consultants (Far East) Ltd. | 107
|
Appendix 9 | The Layers of Soil underneath Blocks 1 and 2 according to the Acer Report | 108 - 109
|
Appendix 10 | Locations of the 24 Boreholes Numbering HY1 to HY24 | 110
|
Appendix 11 | Static Calculations for Piling Design of Block 1 | 111 - 114
|
Appendix 12 | Particular Specification 19.43 | 115
|
Appendix 13 | Locations of Preliminary Piles | 116
|
Appendix 14 | Sequence of Final Set of Piles in Block 1 | 117
|
Appendix 15 | Locations of Boreholes Used in Calculating Settlement of Block 2 | 118
|
Lists of Written Evidence | 121 - 139
|
Minutes of Proceedings | 143 - 148
|
Date | Public Hearings | Witness | Volume
|
---|
The 1st to 19th hearings are in relation to Policies and Working Mechanismsfor the Production of Housing Units Subject to and Exempted fromthe Buildings Ordinance which are not covered by the Second Report.
|
11 September 2001 | 20
| Mr Stephen POON Sing-chi
Former Senior Assistant Director/New Development Housing Department | IIA
|
13 September 2001 | 21 | Part I
Mr Stephen POON Sing-chi
Former Senior Assistant Director/New Development Housing Department | IIA
|
Part II
Ir Alan CLOVER
Ir Rupert LEUNG Kwok-yiu
Representatives of Hyder Consulting Ltd
(formerly known asAcer Consultants (Far East) Ltd) | IIA
|
18 September 2001 | 22
| Mr Joseph KONG Churk-fan
Chief Architect for Tin Shui Wai Area 31 Phase 1 project | IIA
|
20 September 2001 | 23 |
Mr YUEN Tze-chu
Director's Representative for Tin Shui Wai Area 31 Phase 1 project | IIA
|
25 September 2001 | 24
| Part I
Mr Tommy IP Kwok-wing
Quantity Surveyor for Tin Shui Wai Area 31 Phase 1 project | IIA
|
Part II
Mr David LEE Sai-cheung
Chief Structural Engineer for Tin Shui Wai Area 31 Phase 1 project | IIA
|
27 September 2001 | 25
| Mr David LEE Sai-cheung
Chief Structural Engineer for Tin Shui Wai Area 31 Phase 1 project | IIA
|
The 26th hearing was held in camera.
|
9 October 2001 | 27
| Part I
Mr Joseph HO
Mr Conrad CHENG Yuk-keg
Representatives of Hsin Yieh Architects & Associates Ltd | IIB
|
Part II
Mr NG Hon-keung
Mr MAK Lap-ming
Representatives of Joseph Chow & Partners Limited
(JMK Consulting Engineers) | IIB
|
16 October 2001 | 28 | Mr HO Sau-him
Director's Representative for Tin Shui Wai Area 31 Phase 1 project | IIB
|
The 29th hearing was held in camera.
|
23 October 2001 | 30 |
Part I
Mrs Rosa HO LOK So-fun
Liaison Senior Architect for Tin Shui Wai Area 31 Phase 1 project Ms Rosman WAI Chui-chi
Liaison Senior Architect for Tin Shui Wai Area 31 Phase 1 project Mr LI Kar-fai Liaison
Architect for Tin Shui Wai Area 31 Phase 1 project | IIB
|
Part II
Mr Francis LEE Kam-chuen
Liaison Senior Structural Engineer for Tin Shui Wai Area 31 Phase 1 project | IIB
|
The 31st hearing was held in camera.
|
30 October 2001 | 32 | Mr Chezy TANG Wai-chau
Former Project Structural Director Hsin Yieh Architects & Associates Ltd | IIB
|
3 November 2001 | 33 | Mr NG Hon-keung
Mr MAK Lap-ming
Representatives of Joseph Chow & Partners Limited
(JMK Consulting Engineers) | IIB
|
The 34th to 35th hearings were held in camera.
|
13 November 2001 | 36 | Part I Mr SUEN Pak-chiu
Geotechnical Engineer for Tin Shui Wai Area 31 Phase 1 project | IIB
|
Part II Mr WONG Chi-ming
Representative ofC M Wong & Associates Ltd | IIB
|
The 37th hearing was held in camera.
|
20 November 2001 | 38 | Mr NG Hon-keung
Mr MAK Lap-ming
Representatives of Joseph Chow & Partners Limited
(JMK Consulting Engineers) | IIB
|
The 39th to 41st hearings were held in camera.
|
The 42th to 64th and 68th hearings are in relation to Shatin Area 14B Phase 2, Shek Yam Estate Phase 2 and Tung Chung Area 30 Phase 3 projects which are not covered by the Second Report.
|
The 65th to 67th and 69th hearings are in relation to Policies and Working Mechanisms for the Production of Housing Units Subject to and Exempted from the Buildings Ordinance which are not covered by the Second Report.
|
The 70th hearing was held in camera.
|